Tolling

Toll/Conversion Processing

CPMS supports a toll/conversion contract which tracks a toll or conversion process which consumes one product and produces a separate product.

The system tracks specific lots going into the process as well as all material produced by the process. The cost of the produced material is a combination of the price of the material consumed as well as any toll/conversion fee. The process can be defined on a flow basis (first-in-first-out) or on a specific run basis.

A Toll/Conversion report identifies all lots in and out of the process with associated costs.